OpenTED 792163-2026cn-standard

Consultant for approved Climate Action and Mechanical project (Summer Works) for Quignamanger National School 15257V

Buyer
Quignamanger NS (The Quay NS), Ballina
Country
Ireland
Published
13 Nov 2026
Deadline
11 Dec 2026 (earliest lot deadline; time and time zone in the official notice)
Procedure
open
Contract nature
services
Estimated value
€680,000 (sum of published lots)
Place of performance (NUTS)
IE042, IRL
CPV
71315210 (Architecture and engineering services), 71314310 (Architecture and engineering services)

Description (original language)

The existing LPHW Space Heating installation in the original school building dates back to the time of construction of the building in 1983 and is in a poor condition at this stage and requires to be replaced. There is no cavity insulation in the 1983 building, with only 100 mm of attic insulation in this section of the building also. The proposed Climate action works consist of the provision of the top up of the existing attic insulation, provision of pumped cavity wall insulation, provision of a heat pump system and the provision of an twin EV Charging pedestal. The area of the building for which the proposed works are required consist of the original 1983 school building which has a total floor area of approx. 1235m2 and comprises 8 number mainstream classrooms, resource rooms, staff room, library, offices, male and female toilets and staff toilets, GP Hall, heating centre, stores, and circulation areas. Approximate budget for the project is €680,000

Notices can be corrected or cancelled by the buyer. The official notice on TED always prevails.

Source: TED, Publications Office of the EURetrieved: