Clos ou sans date limiteTED 650524-2026cn-standard

Competition - Framework agreement for renovation no-dig, water pipelines including manholes.

Cet avis a été suivi d’un avis plus récent pour la même procédure. (update-add) TED 702304-2026, 12 oct. 2026. Les dates et conditions de l’avis le plus récent prévalent.

Acheteur
Trondheim kommune, TRONDHEIM
Pays
Norway
Publié le
22 sept. 2026
Date limite
2 nov. 2026 (première échéance des lots ; heure et fuseau dans l'avis officiel)
Procédure
open
Nature du marché
works
Valeur estimée
600 000 000 NOK (somme des lots publiés)
Lieu d'exécution (NUTS)
NO060, NOR
CPV
45230000 (Construction work), 45000000 (Construction work), 45231000 (Construction work), 45231300 (Construction work), 45232100 (Construction work)

Historique de la procédure

  1. TED 650524-2026 (cet avis) · 22 sept. 2026 · cn-standard · Date limite 2 nov. 2026
  2. TED 691908-2026 · 7 oct. 2026 · cn-standard · update-add · Date limite 16 nov. 2026
  3. TED 702304-2026 · 12 oct. 2026 · cn-standard · update-add · Date limite 30 nov. 2026

Avis reliés par leur identifiant de procédure TED.

Description (langue d'origine)

The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the number of metres during the contract period. The actual extent will vary, however, and the contracting authority is not obligated to the above mentioned estimate. In addition to planned measures, urgent orders may occur. The framework agreement ́s estimated financial framework, including an option for an extension, is NOK 415,000,000,-, while the maximum limit is NOK 600,000,000,-. This is based on a…

Un avis peut être rectifié ou annulé par l'acheteur. L'avis officiel publié sur TED fait toujours foi.

Source: TED, Publications Office of the EUCollecté le: